How FARWOVEN is made
AI Transparency
FARWOVEN is created and directed by one developer, Michael, with AI tools helping along the way. This page sets out openly how those tools are used, how much they have been used, and what that use is estimated to mean in electricity and data-centre cooling water.
Water used by AI tools
1,014 litres
Last updated
Updated every 3 hours
Who makes FARWOVEN
Made by People, Helped by AI
FARWOVEN is a personal project with a human at the centre of every decision. AI tools are part of the workshop, in the same way an engine, a compiler or a paint program is, and they are used openly.
Creative Direction
Coming soon.
AI as a Tool
Coming soon.
Checked and Owned
Coming soon.
Recorded automatically
Recorded AI Use
The AI models assisting to build FARWOVEN record their own usage, and those records are collected automatically. AI work is counted in tokens: small pieces of text, roughly three-quarters of a word each.
Generated
223 million
tokens written by the AI
Code, text and drafts the AI produced, including its step-by-step working-out.
New Input
1.44 billion
tokens read for the first time
Instructions, files and results the AI read fresh: 284 million read once, plus 1.16 billion stored so they could be re-read later.
Cached Context
60.5 billion
tokens re-read from earlier
Earlier parts of a conversation re-read from the provider’s store each time the AI answered.
The re-reading is by far the largest part. For every token the AI wrote, it re-read about 271 tokens of earlier context. That is normal for long programming sessions, and it matters for the energy estimate below.
261,663 requests to the AI, recorded from 13 September 2026 to 25 November 2026. Use before the records began is not included.
A price for comparison
What It Would Have Cost
If Bought at Public Prices
US$32,323
This is what the recorded use would have cost at the AI providers’ published pay-as-you-go prices. It is a hypothetical comparison for scale, not what was spent. A small part of the use has no published price and is not counted.
Actual Spending
Unknown
The actual cost attributable to FARWOVEN is not yet known. It will only be shown once it can be backed by billing records.
Estimated
Electricity
Estimated Electricity
Central estimate
2,048kWh
Roughly a 10-watt LED bulb left on for about 23 years.
Data-centre electricity for the recorded AI requests, including the building’s cooling and power overhead. The lower and higher illustrative scenarios give 451 and 10,713 kWh.
Nobody outside the AI companies can measure the electricity of these requests directly. The estimate is modelled from the recorded tokens: how much text was read, how much was written, and how much earlier context had to be carried along while writing.
Long context is the biggest single factor. Every new token is written while the earlier conversation is still in view, so long sessions cost more per token than short ones. The model counts this for each request before adding anything up.
It is an estimate with wide uncertainty, not a measurement. The method and its sources are in the cooling-water section’s details below.
Estimated
Cooling Water
Data centres use water to keep their computers cool, and some of it evaporates or is otherwise not returned. This is an estimate of that consumed cooling water for FARWOVEN’s recorded AI use.
Estimated direct data-centre cooling water consumed
1,014litres
Roughly one cubic metre, or about 13 typical baths of 80 litres. Updated every 3 hours; last updated 25 November 2026, 12:55 UTC.
Month by month
- September 2026 (from 13 September)212 litresrunning total 212
- October 2026412 litresrunning total 624
- November 2026 (so far)390 litresrunning total 1,014
- Cooling only. This headline counts water used to cool data centres. It is not FARWOVEN’s total water footprint.
- Electricity generation can also use water. It is not included, because where the electricity came from is not known.
- An illustrative estimate, not a measurement. The real amount could be substantially higher or lower.
How this estimate is made: Cooling water
Three illustrative scenarios
| Scenario | Electricity | Cooling water |
|---|---|---|
| Lower scenario | 451 kWh | 169 litres |
| Central estimate | 2,048 kWh | 1,014 litres |
| Higher scenario | 10,713 kWh | 9,477 litres |
What is covered
- Usage recorded from 13 September 2026 to 25 November 2026, 10:57 UTC by AI models assisting to build FARWOVEN.
- Every recorded request is counted individually before the totals are added up.
What is not covered
- A small number of automatic context-summarising steps that report no usage figures
- Water used to generate electricity (kept out of the headline, as explained above)
Method
- Computer electricity is modelled for each request from its tokens, then added up:
Wh = a × requests + b × written + c × new input + d × Σ(written × context) + e × Σ(new input × (cached + new input ÷ 2)) + f × cachedHere “new input” is input read fresh or stored for re-use, “cached” is earlier context re-read, “context” is new input plus cached, and each Σ adds up one value per request.Central values: a = 0.1 Wh per request, b = 0.0009 Wh per written token, c = 0.00012 Wh per new input token, d = 2 × 10⁻⁸ Wh and e = 4 × 10⁻¹⁰ Wh per token pair, f = 0. - Facility electricity = computer electricity × PUE (power usage effectiveness: the data centre’s cooling and power overhead). It is applied once. Central PUE: 1.15.
- Cooling water = electricity × litres consumed per kWh. The central estimate uses the worldwide data-centre average of 0.495 litres per kWh of facility electricity; the lower scenario also uses facility electricity, and the higher scenario applies its benchmark to computer electricity, as that source does.
The electricity coefficients are illustrative scenario values, not measurements or calibrated results. The AI providers do not publish energy figures for their own models, serving hardware or data-centre locations, so the same values are used for every model. The method comes from a research review prepared for this project and a separate independent audit of it, both carried out with AI research assistants and reviewed by the developer; their early estimates were then recalculated here from the full usage records.
Sources
- World Energy Outlook 2026 (International Energy Agency)Worldwide data-centre water use (Box 1.10, Figure 1.39): the central cooling benchmark.
- Key Questions on Energy and AI (International Energy Agency, 2026)Worldwide data-centre electricity (Table A.1), used to express water per kilowatt-hour.
- 2024 United States Data Center Energy Usage Report (Lawrence Berkeley National Laboratory)US data-centre cooling water per kilowatt-hour: the lower scenario’s benchmark.
- Measuring the environmental impact of delivering AI at Google scale (Elsworth et al., 2025)A large provider’s reported cooling water per kilowatt-hour: the higher scenario’s benchmark.
- The Real Cost of Context: Predicting Compute Time and Energy Consumption in LLM Prefill and Decode Phases (Research paper, 2026 (version 1))Measurements on open models showing why long context matters; used as a sensitivity guide only.
- Save water (Waterwise)A typical bath uses around 80 litres.
Page last updated 25 November 2026, 12:55 UTC; figures last calculated 25 November 2026, 10:57 UTC.
Looking ahead
A Note on Sustainability
Michael is considering a freshwater restoration or other sustainability contribution by the end of the project. The approach has not been decided yet.
Nothing on this page claims that FARWOVEN’s AI use has been offset, balanced or made “water neutral”. If a contribution is made, it will be described here plainly, and suggestions for suitable charities or initiatives may be invited later.
Kept current
How the Figures Stay Current
Usage is recorded automatically, and the estimates are recalculated from those records by the same published method. New figures are checked automatically (validation and privacy checks) before they appear here; the method itself was reviewed and approved by the developer.
Last updated 25 November 2026, 12:55 UTC. Updated about every 3 hours while development is active; figures last calculated 25 November 2026, 10:57 UTC. Method version 1.0.0.